REDESIGN AND CONSTRUCTION OF MEDIUM VOLTAGE SWITCHGEAR PANELS PRODUCTION LINE

When the annual demand on the switchgear panels increased and exceeded the factory capacity, there was a vital need to secure the factory production orders from being delayed, and to avoid penalty payments. The management department had also remarked the continuous increase in WIP and inventory, which impacted the factory cash flow, and after studying […]

RE-ENGINEERING THE OPERATIONS PLANNING

In 2017, the Automation products factory was struggling with the high inventory level in the warehouses and WIP in the production lines, which was generating a high value of Cost of poor quality. The management department was looking to reshape the operations management with the redesign of the production line, and specifically requested to enhance […]